QA/QC Technician – Data Center Construction (Field-Based)
- Chicago, IL
- On-site
- Full time
- Mid-Level
- Posted 5 Oct 2026
- Apply by 4 Dec 2026
The role
Field-based QA/QC Technician supporting the construction of mission-critical data centers. The role is 100% on-site at active construction sites and is not a software or IT quality position. It is a full-time, mid-level position.
Skills and benefits
Full posting
Role Overview
Field-based QA/QC Technician supporting the construction of mission-critical data centers. The role is 100% on-site at active construction sites and is not a software or IT quality position. It is a full-time, mid-level position.
What You Will Do
Perform daily on-site inspections of workmanship, materials, and installations across electrical, mechanical, structural, fire protection, and architectural components. Ensure compliance with drawings, specifications, codes, QA/QC plans, and ITPs. Document results through daily reports, punch lists, deficiency logs, and photos, and work with site teams to drive corrective actions. Identify risks, assist with root cause analysis, and follow up on rework.
Why It Might Be a Fit
Suits candidates with construction QA/QC, inspection, or field engineering experience in data centers, electrical, mechanical, or large commercial construction. The role requires daily field presence, close coordination with site leadership and trade partners, and physical work outdoors and indoors. You must be able to lift up to 50 pounds and wear required PPE.
Requirements
- Construction QA/QC or field inspection experience
- Ability to read and interpret construction drawings, specifications, submittals, and inspection checklists
- Strong understanding of construction means and methods
- Comfortable working full-time on active construction sites
- Strong attention to detail
- Clear, professional written and verbal communication skills
- High school diploma or equivalent