Data center markets
34 US markets hold 912 campuses in the pipeline, ≈238.0 GW estimated. Checked 28 Nov 2026
Know when a market moves
Keep going
Questions
How markets are drawn
As of 2026-11-28, Wattlas tracks 912 planned and under-construction campuses across 34 US data center markets (excluding operating facilities). Each market is a fixed set of counties around a metro or corridor; a campus belongs to the market whose counties contain it. Estimated pipeline MW combines reported capacity, which can come from filings, announcements or third-party sources, with estimates from floor area, acreage, investment or backup generation.
Markets
Related
Which US data center markets have the largest power pipeline?
By estimated total pipeline capacity across confirmed upcoming projects, the top 5 US markets in Wattlas are Northern Virginia (37.5 GW, 267 campuses), Central & Eastern PA (24.0 GW, 48 campuses), West Texas & Panhandle (24.0 GW, 21 campuses), Salt Lake City / Silicon Slopes (21.6 GW, 11 campuses), Atlanta (20.9 GW, 61 campuses). Across all 34 tracked markets, the pipeline totals an estimated 238.0 GW, including 41.4 GW in reported figures.
Which US data center hubs have the lowest industrial electricity rates?
Industrial power rates, large-load tariffs and interconnection queue depth for all 34 markets are included in Wattlas access, alongside the filings behind every campus.
Which US data center markets face the most local moratoria and opposition?
Among the 34 tracked markets, 90 active or extended moratoria and 378 public petitions link directly to campuses in these counties. Markets with the most active/extended moratoria include Charlotte / Piedmont Carolinas (12), Atlanta (9), Detroit / SE Michigan (9), Minneapolis-St. Paul & SE MN (8), Central Washington & Puget Sound (6).
How does Wattlas measure satellite land clearing across US data center markets?
Wattlas monitors 720 exact-parcel pipeline sites with satellite imagery. Across the 34 markets, 234 sites show active earthwork or pad expansion, including 194 clearing ahead of a reported construction stage.