Bitdeer Niles
A 300 MW data center campus in Niles, Ohio, built by Bitdeer. It was announced in May 2026 and has 4 public records behind it. Checked 27 Nov 2026
AnnouncedStage since May 2026
300 MWCapacity, as stated
4Public records
69Moratoria nearby
How far along
- AnnouncedMay 2026
- Zoning
- Site permit
- Building permit
- Construction
- Operating
The announced dates from May 2026. A rezoning or site permit is the next step. Cortland has a moratorium in force 5 km away
Trumbull County, OhioParcel, substation and lines
The record
Opposition nearby
Bazetta Township moratorium2 kmEndedCortland moratorium5 kmIn forceHowland Township moratorium8 kmIn forceWarren moratorium8 kmIn force
Opposition in OhioNearby campuses
Stargate Lordstown≈10 kmConstruction·OracleKeel Infrastructure Sharon Data Center (formerly Bitfarms)≈25 kmSite permit·Keel InfrastructurePittsburgh International Race Complex Data Center (Wampum I LLC)≈50 kmAnnounced·Wampum ISwitch Big Beaver data center campus≈50 kmZoning·Switch
All Ohio projectsKnow when this campus moves
Check your email to finish
Questions
Who owns Bitdeer Niles?
Bitdeer, according to public records.
How big is it?
300 MW, as stated in a public filing.
Has it been approved?
Not yet. It was announced in May 2026.
Is there local opposition?
Yes. 66 moratoria in force and 1 pending and 2 ended nearby.