Cipher Barber Lake

A 244 MW data center campus in Colorado, Texas, built by Cipher Mining. It has had a site permit since September 2025 and has 5 public records behind it. Checked 27 Nov 2026

Site permitStage since Sep 2025
244 MWCapacity, as stated
5Public records

How far along

  1. Announced
  2. Zoning
  3. Site permitSep 2025
  4. Building permit
  5. Construction
  6. Operating

The site permit dates from September 2025. A building permit is the next step

Mitchell County, TexasParcel, substation and lines

The record

County
Mitchell County, TX
Stage
Site permit
Capacity
244 MW
Public records
5
Latest record
1 Sep 2025
Opposition
None on record
Power and grid
  • Utility
  • Substation
  • County queue
Site
  • Exact location
  • Parcel
  • Water stress, flood
Who is on it
  • Tenant
  • Contractors
  • Companies involved
5 records
  • Record 1
  • Record 2
  • Record 3
Utility, substation and 5 public records for Cipher Barber LakeOpen the app, freeStart Pro · $299/mo

Know when this campus moves

Check your email to finish

Questions

Who owns Cipher Barber Lake?
Cipher Mining, with Northstar Energy Services also named, according to public records.
How big is it?
244 MW, as stated in a public filing.
Has it been approved?
Yes. It has had a site permit since September 2025.
Is there local opposition?
Not on record