MEDP Mission Critical Facility, LLC dba Metro Edge (Chicago)

A 20 MW data center campus in Chicago, Illinois, built by Medp Mission Critical Facility LLC Dba Metro Edge. It was announced in 2023 and has 1 public record behind it. Checked 27 Nov 2026

AnnouncedStage since 2023
20 MWCapacity, as stated
1Public records
1Opposition record

How far along

  1. Announced2023
  2. Zoning
  3. Site permit
  4. Building permit
  5. Construction
  6. Operating

The announced dates from 2023. A rezoning or site permit is the next step

Cook County, IllinoisParcel, substation and lines

The record

Owner
Medp Mission Critical Facility LLC Dba Metro Edge
Stage
Announced
Capacity
20 MW
Public records
1
Power and grid
  • Utility
  • Substation
  • County queue
Site
  • Exact location
  • Parcel
  • Water stress, flood
Who is on it
  • Tenant
  • Contractors
  • Companies involved
1 record
  • Record 1
Utility, substation and 1 public record for MEDP Mission Critical Facility, LLC dba Metro Edge (Chicago)Open the app, freeStart Pro · $299/mo

Know when this campus moves

Check your email to finish

Questions

Who owns MEDP Mission Critical Facility, LLC dba Metro Edge (Chicago)?
Medp Mission Critical Facility LLC Dba Metro Edge, with Metro Edge also named, according to public records.
How big is it?
20 MW, as stated in a public filing.
Has it been approved?
Not yet. It was announced in 2023.
Is there local opposition?
Yes. 1 opposition record on file.