Rowan Moriah Campus
An estimated 18–83 MW data center campus in Temple, Texas, run by Rowan Digital Infrastructure. It is listed as operating and has 2 public records behind it. Checked 27 Nov 2026
OperatingStatus
≈18–83 MWCapacity, our estimate
2Public records
How far along
- Operating
Bell County, TexasParcel, substation and lines
The record
- County
- Bell County, TX
- Status
- Capacity
- ≈18–83 MW
- Public records
- 2
- Opposition
- None on record
Power and grid
- Utility
- Substation
- County queue
Site
- Exact location
- Parcel
- Water stress, flood
Who is on it
- Tenant
- Contractors
- Companies involved
2 records
- Record 1
- Record 2
Utility, substation and 2 public records for Rowan Moriah CampusOpen the app, freeStart Pro · $299/mo
Know when this campus moves
Check your email to finish
Questions
Who owns Rowan Moriah Campus?
Rowan Digital Infrastructure, according to public records.
How big is it?
About 18–83 MW. This is our estimate from permitted sq ft, not a stated figure.
Has it been approved?
Yes. It is listed as operating.
Is there local opposition?
Not on record