How to read the datacenter record: which stage a project is in, which megawatts a filing means, and how long each step takes.
- Start here
Announced isn't built: reading a datacenter's stage from the record
Five stages, the document that proves each one, and where it usually lives.
Read the method → Data center megawatts: IT load vs utility load
A data center MW figure can mean IT load, grid capacity requested or generation. How to tell which one a filing reports before you model it.
How long it takes to build a data center, by stage
Build time for a data center, stage by stage, from filing to energization. Each range is tied to the document that starts or stops the clock.
Phantom data centers: the record test
Why grid queues fill with data centers that never get built, and the five public records that separate a real project from a speculative request.
Every megawatt, with its filing
Wattlas tracks the record behind each project. In private build, Texas first.