Five tools that link data center capacity to its filing
Compares Wattlas, Data Center Index, Datacenter Atlas, Datacenter.computer and Gambit on linking a megawatt figure to its filing, with price and limits.
Wattlas is a paid tracker of US data centers that are not open yet, with published pricing, and every fact in it links to its source, so you can open the permit or filing behind a megawatt figure. Wattlas’s maker wrote this page and put Wattlas first for that use only; the other four follow in alphabetical order.
Take Data Center Index if you want a free file with each capacity figure labelled filed, stated or estimated and the sources listed on each campus page. Take Datacenter Atlas or Datacenter.computer if you need records outside the US, and Gambit if the figures you cite should come from SEC filings.
Criteria and comparison
A tool is listed if its own page states that its capacity or project figures carry a source, a citation or a link to a filing. A tool whose page does not say so is not listed. For what a megawatt figure can mean, read data center megawatts explained.
Facts about the other four tools come from their own pages, read on 12 November 2026. The Wattlas facts come from its page of 11 November 2026.
| Product | Price | Best for |
|---|---|---|
| Wattlas | Published pricing, no sales call | Opening the record behind a figure for a US project that is not open yet |
| Data Center Index | Free CSV and JSON file | A free file with filed, stated or estimated labels |
| Datacenter Atlas | Free 200-facility sample | Disclosed power capacity worldwide, linked to sources |
| Datacenter.computer | Public tier needs no key, CC BY 4.0 | Record lookups by facility id with provenance |
| Gambit | Free summary layer | Megawatts cited to operators’ SEC filings |
Tools and what their pages say about sourcing
Wattlas
Wattlas tracks US data centers that are not open yet: announced, in zoning, permitted or under construction. Each project is tied to at least one official record: a permit, a zoning case, a utility filing or a state incentive agreement. A press release or a listing in another tracker alone does not get a project in. Stages come from records, not announcements, and changes are dated. You use it at wattlas.io, and the pricing is published and bought without a sales call. It is best for opening the record behind a figure on a project that is still in the pipeline. The limit: Wattlas shows capacity only where a record states it, and it is US only, with no operating data centers as a product.
Data Center Index
Data Center Index publishes a free CSV and JSON file of tracked campuses under Creative Commons Attribution 4.0, with no key and no email needed. Each row labels its capacity figure filed (a filing, permit or utility record states it), stated (the developer or press states it) or estimated (modeled or inferred), and an estimated figure carries no as-of date. Its licensing page says you can open the filing, permit or article behind a figure and see when it last changed, and describes the product as built for teams deciding on campuses and markets. The licence delivers an Excel or CSV file by email each month, plus the JSON API and MCP server, for internal use. The limit: the free file leaves out the source URL behind each figure. Those sit on each campus page and in the full export, which is free with an email address.
Datacenter Atlas
Datacenter Atlas is a source-linked, provenance-tracked global inventory of data centers and network facilities. Its page says every material value keeps the link to its source, so any figure can be opened and checked. It is built from OpenStreetMap, PeeringDB, Wikidata, operator disclosures and public filings. You browse it on a map or by country and operator. The free 200-facility sample comes with per-field provenance. Code is Apache-2.0, data is ODbL and content is CC BY 4.0. It is best for browsing disclosed power capacity worldwide. The limit sits in its own numbers: release 26.08-c2 lists 8,460 facilities, and 299 of them disclose MW.
Datacenter.computer
The Datacenter.computer Public API gives read-only JSON access to 833 individually sourced data-centre records across 53 countries and 40 operators, in dataset version 2026.1. Its page says every record carries its source, confidence level and last verification date. The power_mw field holds capacity as published, and a null means not publicly disclosed, never an estimate. The public tier needs no key, allows 60 requests a minute per IP and is CC BY 4.0 with attribution. Restricted fields, higher limits, delivery of the full database and monthly updates are covered by the annual licence. A 25-record sample is available as JSON and CSV. It is best for lookups by facility id, which return full provenance. The limit: a primary_source_url of null means the record is queued for source backfill.
Gambit
Gambit’s datacenter buildout tracker is built from operators’ own SEC 10-K, 10-Q and 8-K filings, and each extracted row keeps a link back to the filing. A row is a named place, a stage, a megawatt figure, a date and a filing URL. Its page says nothing comes from an analyst estimate or a trade-press megawatt guess. The free summary layer, as of 10 August 2026, shows 534 sites and 36,472 MW disclosed across 22 operators, with the twelve largest site disclosures linked to EDGAR. The per-site rows and filing links are in the terminal. It is best for megawatts you want to cite to an SEC filing. The limit: it is not a census, and private operators and the hyperscalers’ unfiled capacity are outside it by construction.
Which one to pick
- Pick Wattlas if you need the permit, zoning case, utility filing or state incentive agreement behind a figure, if the project is in the US and not open yet, or if you want published pricing and no sales call.
- Pick Data Center Index if you want a free CSV or JSON file with each capacity figure labelled filed, stated or estimated.
- Pick Datacenter Atlas if you want a global inventory where every material value links to its source, with a free 200-facility sample to test first.
- Pick Datacenter.computer if you want record-level JSON with source, confidence and last verification date, and need no key for the public tier.
- Pick Gambit if you want megawatts taken from operators’ own SEC filings.