LINX

Low Voltage Lead Technician – Data Center Construction

  • El Paso, TX
  • $28 to $35 an hour
  • On-site
  • Full time
  • Lead
  • Posted 11 Nov 2026
  • Apply by 10 Jan 2027

The role

LINX is hiring a Low Voltage Lead Technician to run crews of 5 or more technicians on hyperscale data center cabling projects. The role requires experience leading crews of low voltage technicians and giving them daily duties. This is a working lead role, not a desk job.

Skills and benefits

LeadershipHands-on experience with low voltage or structured cablingBlueprint reading and interpretationFluke cable testingSwitch, router, modem, and wireless access point installation and configuration401(k) with 50% employer match on the first 5% contributedMedical, dental, and vision insurance with FSA and HSA optionsShort and long-term disability coverage3 weeks PTO (vacation and sick combined)8 paid holidaysManufacturer training and certification supportStructured advancement path toward Foreman and Superintendent
Full posting

Role Overview

LINX is hiring a Low Voltage Lead Technician to run crews of 5 or more technicians on hyperscale data center cabling projects. The role requires experience leading crews of low voltage technicians and giving them daily duties. This is a working lead role, not a desk job.

What You Will Do

Supervise and direct the daily work of 5 or more technicians on active hyperscale data center cabling projects, plan site manpower needs, and manage material and labor flow through job completion.

Why It Might Be a Fit

This role is a direct step on the path to Foreman and Superintendent, and requires hands-on experience terminating jacks, patch panels, and 66/110 blocks, running Fluke certification tests, and installing and configuring switches, routers, modems, and wireless access points.

Requirements

  • 3+ years of hands-on low voltage or structured cabling experience
  • 1+ year experience leading and delegating to a crew of 5 or more technicians
  • Proficient reading and interpreting blueprints
  • Ability to terminate jacks, patch panels, and 66/110 blocks to 568A/B color code standards
  • Hands-on experience with Fluke cable testers (DSX-600/8000 series)
  • Ability to install and configure switches, routers, modems, and wireless access points
  • Experience running category cable, coax (RG6, RG11, RG59), and fiber
  • Ability to operate Hilti powder actuated tools, hammer drills, band saws, and standard low voltage power tools
  • Ability to lift, carry, and set up a 50 pound box or ladder
  • Available to work 2nd or 3rd shift, overtime, and under deadline pressure
  • Must pass a 7 year criminal background check, pre-employment drug screen, and physical
  • Valid driver's license, reliable transportation, and current auto insurance
  • Professional working proficiency in English, written and verbal

Benefits

  • 401(k) with 50% employer match on the first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • Short and long-term disability coverage
  • 3 weeks PTO (vacation and sick combined)
  • 8 paid holidays
  • Manufacturer training and certification support
  • Structured advancement path toward Foreman and Superintendent