LINX

Low Voltage Technician – Data Center Construction

  • El Paso, TX
  • $20 to $29 an hour
  • On-site
  • Full time
  • Junior
  • Posted 2 Oct 2026
  • Apply by 1 Dec 2026

The role

LINX is hiring Low Voltage Technicians to build out structured cabling infrastructure on active data center construction projects. The role involves running and terminating cable, building out MDF/IDF closets, and testing every run before it's signed off, on a crew that's standing up a data center's cabling infrastructure from the ground up.

Skills and benefits

cable installationterminationtestingtroubleshooting401(k) with 50% employer match on the first 5% contributedMedical, dental, and vision insurance with FSA and HSA optionsShort and long-term disability coverage3 weeks PTO (vacation and sick combined)8 paid holidaysManufacturer training and certification support
Full posting

Role Overview

LINX is hiring Low Voltage Technicians to build out structured cabling infrastructure on active data center construction projects. The role involves running and terminating cable, building out MDF/IDF closets, and testing every run before it's signed off, on a crew that's standing up a data center's cabling infrastructure from the ground up.

What You Will Do

Install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cable. Troubleshoot low voltage cable systems as issues come up on site.

Why It Might Be a Fit

This role is for those with experience in commercial construction, particularly in low voltage installation. The ideal candidate will have a defined path for advancement from Technician I through Technician III and beyond.

Requirements

  • Able to work on ladders and use power tools; able to lift, carry, and set up a 50 pound box or ladder
  • Must own a complete set of personal low voltage hand tools (snips, strippers, screwdrivers, wrenches)
  • Available to work 2nd or 3rd shift, overtime, and under deadline pressure
  • Must pass a 7 year criminal background check, pre-employment drug screen, and physical
  • Valid driver's license, reliable transportation, and current auto insurance
  • Professional working proficiency in English, written and verbal

Benefits

  • 401(k) with 50% employer match on the first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • Short and long-term disability coverage
  • 3 weeks PTO (vacation and sick combined)
  • 8 paid holidays
  • Manufacturer training and certification support