Site Lead - Datacenter Construction, Thermal & AC Power - Atlanta
- Atlanta, GA
- On-site
- Full time
- Lead
- Posted 14 Oct 2026
- Apply by 13 Dec 2026
The role
The Site Leader will provide world-class jobsite leadership for large, long-duration, high-profile projects for Vertiv power and/or thermal equipment. The Site Leader is the primary Vertiv Service on-site technical representative for large jobs, from construction start, through start-up, site acceptance testing, and project completion.
Skills and benefits
Full posting
Role Overview
The Site Leader will provide world-class jobsite leadership for large, long-duration, high-profile projects for Vertiv power and/or thermal equipment. The Site Leader is the primary Vertiv Service on-site technical representative for large jobs, from construction start, through start-up, site acceptance testing, and project completion.
What You Will Do
Provide jobsite construction and technical leadership for large projects, lead a multi-disciplinary on-site team, represent Vertiv at daily customer meetings, and ensure sufficient manpower on-site each day to perform start-up and site testing work.
Why It Might Be a Fit
The successful candidate will have experience in industrial construction management, strong organizational skills, and the ability to build and maintain trusting customer relationships.
Requirements
- ASEET or ASMET preferred
- Equivalent industry experience, specifically leading and actively participating in start-up and commissioning of power and/or hvac equipment preferred
- Six years military experience in a related field
- Minimum 2 years of experience in Industrial construction management
- Vertiv Behavior practitioner
- Strong organizational skills
- Independent operator
- Strong verbal and written communication skills
- Able to build and maintain trusting customer relationships
- Collaborative and cooperative in high-stress environments
- Able to communicate at all levels of an organization with a base level of executive presence
- Able to quickly respond to changing customer priorities without disruption or resistance
- Must be able to read and interpret electrical one-line diagrams and blueprints
- Product certifications up to date
- Meet all aspects of the job description
- Performance evaluation rating of meets all aspects of job requirement or better
- Consistent performance and customer relation skills
- Ability to make an immediate site evaluation, skills to include: environmental temperature, and general operating conditions without supervision
- Ability to summarize and report all work related tasks performed
- Independently evaluate, recognize and recommend acceptable customer solutions based upon site evaluation
- Recommend and direct activities at a customer site by leading technical activities of other technicians
- Provide on-site customer consultation with the assistance of Project Leader(s)
- Capable of providing project leadership and on-site direction for assigned projects
- Expert in COHE procedures
- Expert in site acceptance testing procedures and equipment
- Advanced word processing, report generation
- Spreadsheet processing
- Electronic mail
- Test equipment and data analysis programs
- Familiarity with computer networks
- Mechanical aptitude
Benefits
- Dental insurance
- Vision insurance
- Health insurance
- 401k
- Paid time off
- Wellness programs
- Relocation assistance
- Visa sponsorship
- Stock options
- Bonus/commission
- Paid holidays