Central & Eastern Iowa

Central & Eastern Iowa is market 17 of 34: about 3.6 GW across 10 campuses in 8 counties. 3 under construction and 1 moratorium in force. Checked 28 Nov 2026

10Campuses
≈3.6 GWIn the pipeline
3Under construction
1Moratoria in force

The shape of the market

By stage

  • Announced2
  • Zoning1
  • Site permit4
  • Construction3

Stated and estimated

  • Stated on recordNot on record
  • Our estimate≈3.6 GW

By county

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for Central & Eastern IowaOpen the app, freeStart Pro · $299/mo

Track Central & Eastern Iowa in the app, free

Check your email to finish

Questions

How many data centers are in Central & Eastern Iowa?

11 tracked pipeline campuses (3.6 GW estimated total, 0 MW reported) across 8 counties in Iowa. Key signals: 4 sites showing earthwork in satellite imagery, 2 active/extended moratoria.

Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 44.4% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

1 moratorium is in force in Central & Eastern Iowa, covering 2 campuses. 3 moratoria and 4 petitions are on record across the market. 0 of 11 campuses sit in high water stress.

How is this market drawn?

Central & Eastern Iowa is the 8 counties around its campuses in Iowa, in MISO. It ranks 17 of 34 markets by estimated pipeline.

How large is the Central & Eastern Iowa data center pipeline?

Wattlas tracks 11 upcoming pipeline campuses in Central & Eastern Iowa (7 verified, 3 under construction, 5 permitted), representing 0 MW in reported capacity and 3,637 MW total estimated pipeline. Projects with the largest reported figures include QTS Cedar Rapids Data Center Campus (1,000+ MW), Tract Altoona (1,000+ MW), Google Cedar Rapids Data Center Campus (500–999 MW).

What are industrial power rates and serving utilities in Central & Eastern Iowa?

Central & Eastern Iowa sits in MISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Central & Eastern Iowa data centers?

Across tracked campuses in Central & Eastern Iowa, Wattlas links 2 active or extended moratoria (3 total) and 4 public petitions. On physical site risk, 0 of 11 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Central & Eastern Iowa data center sites show active satellite land clearing?

Of 9 pinpointed pipeline sites monitored with satellite imagery in Central & Eastern Iowa, 4 (44.4%) show active earthwork or pad expansion, including 3 sites clearing ahead of a reported construction stage.