Detroit / SE Michigan
Detroit / SE Michigan is market 31 of 34: about 200 MW across 2 campuses in 6 counties. 0 under construction and 0 moratoria in force. Checked 28 Nov 2026
The shape of the market
By stage
- Announced1
- Site permit1
Stated and estimated
- Stated on recordNot on record
- Our estimate≈200 MW
Who is building
- University of Michigan100 MW1
MetrobloksNot on record1
By county
- Oakland1
- Washtenaw1
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Detroit / SE Michigan in the app, free
Questions
How many data centers are in Detroit / SE Michigan?
2 tracked pipeline campuses (200 MW estimated total, 0 MW reported) across 6 counties in Michigan. Key signals: 9 active/extended moratoria, 1 pipeline site in high/extremely high water stress.
Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 0.0% of monitored sites show clearing.
Who is building the most?
Which counties have paused new data centers?
No moratorium is in force in Detroit / SE Michigan today. 11 moratoria and 0 petitions are on record across the market. 1 of 2 campuses sit in high water stress.
How is this market drawn?
Detroit / SE Michigan is the 6 counties around its campuses in Michigan, in MISO. It ranks 31 of 34 markets by estimated pipeline.
How large is the Detroit / SE Michigan data center pipeline?
Wattlas tracks 2 upcoming pipeline campuses in Detroit / SE Michigan (0 verified, 0 under construction, 1 permitted), representing 0 MW in reported capacity and 200 MW total estimated pipeline. Projects with the largest reported figures include Metrobloks Southfield Data Center (50–499 MW), University of Michigan Textile Road Data Center (50–499 MW).
What are industrial power rates and serving utilities in Detroit / SE Michigan?
Detroit / SE Michigan sits in MISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Detroit / SE Michigan data centers?
Across tracked campuses in Detroit / SE Michigan, Wattlas links 9 active or extended moratoria (11 total) and 0 public petitions. On physical site risk, 1 of 2 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Detroit / SE Michigan data center sites show active satellite land clearing?
Of 1 pinpointed pipeline sites monitored with satellite imagery in Detroit / SE Michigan, 0 (0.0%) show active earthwork or pad expansion, including 0 sites clearing ahead of a reported construction stage.