SE Wisconsin

SE Wisconsin is market 16 of 34: about 3.7 GW across 5 campuses in 10 counties. 1 under construction and 3 moratoria in force. Checked 28 Nov 2026

5Campuses
≈3.7 GWIn the pipeline
1Under construction
3Moratoria in force

The shape of the market

By stage

  • Announced1
  • Site permit3
  • Construction1

Stated and estimated

  • Stated on recordNot on record
  • Our estimate≈3.7 GW

Who is building

  • OpenAI3,500 MW1
  • Clop Madison WI LLC Site20 MW1
  • Epic Hosting4 MW1
  • DegasNot on record1
  • MetaNot on record1

By county

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for SE WisconsinOpen the app, freeStart Pro · $299/mo

Track SE Wisconsin in the app, free

Check your email to finish

Questions

How many data centers are in SE Wisconsin?

6 tracked pipeline campuses (3.7 GW estimated total, 0 MW reported) across 10 counties in Wisconsin. Key signals: 3 sites showing earthwork in satellite imagery, 5 active/extended moratoria, 3 pipeline sites in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 75.0% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

3 moratoria are in force in SE Wisconsin, covering 4 campuses. 5 moratoria and 11 petitions are on record across the market. 3 of 6 campuses sit in high water stress.

How is this market drawn?

SE Wisconsin is the 10 counties around its campuses in Wisconsin, in MISO. It ranks 16 of 34 markets by estimated pipeline.

How large is the SE Wisconsin data center pipeline?

Wattlas tracks 6 upcoming pipeline campuses in SE Wisconsin (3 verified, 1 under construction, 4 permitted), representing 0 MW in reported capacity and 3,745 MW total estimated pipeline. Projects with the largest reported figures include Vantage WI-1 (1,000+ MW), Degas Beaver Dam Data Center (50–499 MW), Oppidan Data Center (Under 50 MW).

What are industrial power rates and serving utilities in SE Wisconsin?

SE Wisconsin sits in MISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect SE Wisconsin data centers?

Across tracked campuses in SE Wisconsin, Wattlas links 5 active or extended moratoria (5 total) and 11 public petitions. On physical site risk, 3 of 6 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many SE Wisconsin data center sites show active satellite land clearing?

Of 4 pinpointed pipeline sites monitored with satellite imagery in SE Wisconsin, 3 (75.0%) show active earthwork or pad expansion, including 2 sites clearing ahead of a reported construction stage.