Dorrance Township Zoning Challenge (Brewster Land)

A 600 MW data center campus in Dorrance, Pennsylvania, built by Brewster Land. It has been announced and has 6 public records behind it. Checked 27 Nov 2026

AnnouncedStage
600 MWCapacity, as stated
6Public records
3Moratoria nearby

How far along

  1. Announced
  2. Zoning
  3. Site permit
  4. Building permit
  5. Construction
  6. Operating

Publicly announced by the developer, a utility or local officials, with no land-use filing found yet. A rezoning or site permit is the next step. Hazle Township has a moratorium in force 25 km away

Luzerne County, PennsylvaniaParcel, substation and lines

The record

Owner
Brewster Land
Stage
Announced
Capacity
600 MW
Public records
6
Power and grid
  • Utility
  • Substation
  • County queue
Site
  • Exact location
  • Parcel
  • Water stress, flood
Who is on it
  • Tenant
  • Contractors
  • Companies involved
6 records
  • Record 1
  • Record 2
  • Record 3
Utility, substation and 6 public records for Dorrance Township Zoning Challenge (Brewster Land)Open the app, freeStart Pro · $299/mo

Know when this campus moves

Check your email to finish

Questions

Who owns Dorrance Township Zoning Challenge (Brewster Land)?
Brewster Land, according to public records.
How big is it?
600 MW, as stated in a public filing.
Has it been approved?
Not yet. It has been announced.
Is there local opposition?
Yes. 1 moratorium in force and 2 ended nearby.