Omaha / Papillion
Omaha / Papillion is market 34 of 34: about 10 MW across 3 campuses in 5 counties. 0 under construction and 0 moratoria in force. Checked 28 Nov 2026
The shape of the market
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Omaha / Papillion in the app, free
Questions
How many data centers are in Omaha / Papillion?
6 tracked pipeline campuses (10 MW estimated total, 0 MW reported) across 5 counties in Nebraska.
Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 0.0% of monitored sites show clearing.
Who is building the most?
Which counties have paused new data centers?
No moratorium is in force in Omaha / Papillion today. 0 moratoria and 0 petitions are on record across the market. 0 of 6 campuses sit in high water stress.
How is this market drawn?
How large is the Omaha / Papillion data center pipeline?
Wattlas tracks 6 upcoming pipeline campuses in Omaha / Papillion (5 verified, 0 under construction, 6 permitted), representing 0 MW in reported capacity and 10 MW total estimated pipeline.
What are industrial power rates and serving utilities in Omaha / Papillion?
Omaha / Papillion sits in SPP. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Omaha / Papillion data centers?
Across tracked campuses in Omaha / Papillion, Wattlas links 0 active or extended moratoria (0 total) and 0 public petitions. On physical site risk, 0 of 6 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Omaha / Papillion data center sites show active satellite land clearing?
Of 5 pinpointed pipeline sites monitored with satellite imagery in Omaha / Papillion, 0 (0.0%) show active earthwork or pad expansion, including 0 sites clearing ahead of a reported construction stage.