Central & Eastern PA
Central & Eastern PA is market 2 of 34: about 24.0 GW across 41 campuses in 16 counties. 3 under construction and 1 moratorium in force. Checked 28 Nov 2026
Largest campuses
All 41 campuses
The shape of the market
By stage
- Announced28
- Zoning3
- Site permit7
- Construction3
Stated and estimated
- Stated on record5.1 GW
- Our estimate≈18.9 GW
Who is building
Amazon2,940 MW5
Northpoint Development1,200 MW2- 4 3 Glen Brook Group LLC4,000 MW1
- Slate Belt2,100 MW1
- Archbald Ventures1,600 MW1
What could slow it
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Central & Eastern PA in the app, free
Questions
How many data centers are in Central & Eastern PA?
48 tracked pipeline campuses (24.0 GW estimated total, 5,100 MW reported) across 16 counties in Pennsylvania. Key signals: 17 sites showing earthwork in satellite imagery, 5 active/extended moratoria.
Estimated pipeline MW combines reported capacity (5,100 MW) with estimates from floor area, acreage, investment or backup generation. 38.6% of monitored sites show clearing.
Who is building the most?
Which counties have paused new data centers?
1 moratorium is in force in Central & Eastern PA, covering 1 campus. 9 moratoria and 29 petitions are on record across the market. 0 of 48 campuses sit in high water stress.
How is this market drawn?
Central & Eastern PA is the 16 counties around its campuses in Pennsylvania, in PJM. It ranks 2 of 34 markets by estimated pipeline.
How large is the Central & Eastern PA data center pipeline?
Wattlas tracks 48 upcoming pipeline campuses in Central & Eastern PA (11 verified, 3 under construction, 10 permitted), representing 5,100 MW in reported capacity and 23,999 MW total estimated pipeline. Projects with the largest reported figures include Salem 3 Data Center Campus (4-3 Glen Brook Group) (1,000+ MW), River Pointe Data Center (1,000+ MW), Amazon Data Services Inc - PHL 200 (1,000+ MW).
What are industrial power rates and serving utilities in Central & Eastern PA?
Central & Eastern PA sits in PJM. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Central & Eastern PA data centers?
Across tracked campuses in Central & Eastern PA, Wattlas links 5 active or extended moratoria (9 total) and 29 public petitions. On physical site risk, 0 of 48 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Central & Eastern PA data center sites show active satellite land clearing?
Of 44 pinpointed pipeline sites monitored with satellite imagery in Central & Eastern PA, 17 (38.6%) show active earthwork or pad expansion, including 15 sites clearing ahead of a reported construction stage.