EdgeConneX ATL11-13

A 270 MW data center campus in Union City, Georgia, built by EdgeConneX. It has been announced and has 2 public records behind it. Checked 27 Nov 2026

AnnouncedStage
270 MWCapacity, as stated
2Public records
6Moratoria nearby

How far along

  1. Announced
  2. Zoning
  3. Site permit
  4. Building permit
  5. Construction
  6. Operating

Publicly announced by the developer, a utility or local officials, with no land-use filing found yet. A rezoning or site permit is the next step. East Point (Fulton County) has a moratorium in force 13 km away

Fulton County, GeorgiaParcel, substation and lines

The record

Stage
Announced
Capacity
270 MW
Public records
2
Power and grid
  • Utility
  • Substation
  • County queue
Site
  • Exact location
  • Parcel
  • Water stress, flood
Who is on it
  • Tenant
  • Contractors
  • Companies involved
2 records
  • Record 1
  • Record 2
Utility, substation and 2 public records for EdgeConneX ATL11-13Open the app, freeStart Pro · $299/mo

Know when this campus moves

Check your email to finish

Questions

Who owns EdgeConneX ATL11-13?
EdgeConneX, according to public records.
How big is it?
270 MW, as stated in a public filing.
Has it been approved?
Not yet. It has been announced.
Is there local opposition?
Yes. 5 moratoria in force and 1 ended nearby.