Navix Engineering
MWH08 Data Center
An estimated 71–330 MW data center campus in Quincy, Washington, built by Navix Engineering. It has had a site permit since January 2026 and has 1 public record behind it. Checked 27 Nov 2026
Site permitStage since Jan 2026
≈71–330 MWCapacity, our estimate
1Public records
22Moratoria nearby
How far along
- Announced
- Zoning
- Site permitJan 2026
- Building permit
- Construction
- Operating
The site permit dates from January 2026. A building permit is the next step. Kittitas County has a moratorium in force 85 km away
Grant County, WashingtonParcel, substation and lines
The record
- Owner
- Navix Engineering
- County
- Grant County, WA
- Stage
- Site permit
- Capacity
- ≈71–330 MW
- Public records
- 1
- Latest record
- 1 Jan 2026
Power and grid
- Utility
- Substation
- County queue
Site
- Exact location
- Parcel
- Water stress, flood
Who is on it
- Tenant
- Contractors
- Companies involved
1 record
- Record 1
Know when this campus moves
Check your email to finish
Questions
Who owns MWH08 Data Center?
Navix Engineering, according to public records.
How big is it?
About 71–330 MW. This is our estimate from permitted sq ft, not a stated figure.
Has it been approved?
Yes. It has had a site permit since January 2026.
Is there local opposition?
Yes. 16 moratoria in force and 2 pending and 4 ended nearby.