Data center projects in Florida
8 campuses are planned or being built in Florida, with 1.2 GW disclosed so far. 5 have a site permit or later. Checked 27 Nov 2026
8Campuses
1.2 GWDisclosed capacity
31Moratoria in force
FloridaOpen map
One or two campusesThree or more
Fort Meade Florida CampusBohler PlacesPolkZoning1,200 MWDoral Data Center Parking Lot ImprovementsBaptist Health South FloridaMiami-DadeSite permit≈13–59 MWViera Data Center - Phase 1Satcom DirectBrevardSite permit≈13–58 MWVerizon Orlando Data CenterChuginOrangeSite permit≈8–38 MWComcast Data Center
Comcast Data CenterOrangeSite permit
Comcast of FL MI NM PA WABrowardSite permitHostDime Maitland Data Center
HostdimeOrangeAnnouncedMetrobloks Miami Data Center
MetrobloksMiami-DadeAnnounced
Utility, substation and records for every rowUtility and substationStart Pro · $299/mo
Comcast Miramar Data CenterNo campuses match
Where Florida stands
By stage
Top counties
- Orange3
- Miami-Dade2
- Brevard1
- Broward1
- Polk1
Top owners
- Bohler Places1,200 MW1
- Baptist Health South FloridaNot on record1
- ChuginNot on record1
Comcast Data CenterNot on record1
Comcast of FL MI NM PA WANot on record1
Track Florida in the app, free
Check your email to finish
What the stages mean
- AnnouncedNamed by the owner or an official
- ZoningRezoning filed or approved
- Site permitSite plan or land use approved
- Building permitPermit to build issued
- ConstructionWork on site has started
- OperatingRunning and taking load
Questions
How many data centers are being built in Florida?
8 campuses are planned or being built. 0 are under construction and 5 have a site permit or later
Announced 2 · Zoning approved 1 · Site permit 5
Which Florida counties have the most?
Who is building them?
Bohler Places 1Baptist Health South Florida 1Chugin 1Comcast Data Center 1Comcast of FL MI NM PA WA 1
How do you know a project is real?
Every campus here is matched to at least one public filing: an announcement, a rezoning, a site plan or a permit. As of 2026-11-27, Wattlas lists 255 campuses in Florida, 224 of them operating and 23 reported plans not yet confirmed by a filing