Stream

A 7 MW data center campus in Chaska, Minnesota, built by IP Stream Minneapolis. It has been announced and has 2 public records behind it. Checked 27 Nov 2026

AnnouncedStage
7 MWCapacity, as stated
2Public records
4Moratoria in force nearby

How far along

  1. Announced
  2. Zoning
  3. Site permit
  4. Building permit
  5. Construction
  6. Operating

Publicly announced by the developer, a utility or local officials, with no land-use filing found yet. A rezoning or site permit is the next step. Carver has a moratorium in force 2 km away

Carver County, MinnesotaParcel, substation and lines

The record

Owner
IP Stream Minneapolis
Stage
Announced
Capacity
7 MW
Public records
2
Power and grid
  • Utility
  • Substation
  • County queue
Site
  • Exact location
  • Parcel
  • Water stress, flood
Who is on it
  • Tenant
  • Contractors
  • Companies involved
2 records
  • Record 1
  • Record 2
Utility, substation and 2 public records for StreamOpen the app, freeStart Pro · $299/mo

Know when this campus moves

Check your email to finish

Questions

Who owns Stream?
IP Stream Minneapolis, according to public records.
How big is it?
7 MW, as stated in a public filing.
Has it been approved?
Not yet. It has been announced.
Is there local opposition?
Yes. 4 moratoria in force nearby.