Design, LLC data center tax abatement

An estimated 18–81 MW data center campus in Henderson, Nevada, built by Design. It was announced in November 2018 and has 3 public records behind it. Checked 27 Nov 2026

AnnouncedStage since Nov 2018
≈18–81 MWCapacity, our estimate
3Public records
7Moratoria nearby

How far along

  1. AnnouncedNov 2018
  2. Zoning
  3. Site permit
  4. Building permit
  5. Construction
  6. Operating

The announced dates from November 2018. A rezoning or site permit is the next step. Nye County has a moratorium in force 268 km away

Clark County, NevadaParcel, substation and lines

The record

Owner
Design
Stage
Announced
Capacity
≈18–81 MW
Public records
3
Latest record
1 Nov 2018
Power and grid
  • Utility
  • Substation
  • County queue
Site
  • Exact location
  • Parcel
  • Water stress, flood
Who is on it
  • Tenant
  • Contractors
  • Companies involved
3 records
  • Record 1
  • Record 2
  • Record 3
Utility, substation and 3 public records for Design, LLC data center tax abatementOpen the app, freeStart Pro · $299/mo

Know when this campus moves

Check your email to finish

Questions

Who owns Design, LLC data center tax abatement?
Design, with Google also named, according to public records.
How big is it?
About 18–81 MW. This is our estimate from permitted sq ft, not a stated figure.
Has it been approved?
Not yet. It was announced in November 2018.
Is there local opposition?
Yes. 5 moratoria in force and 2 ended nearby.