Buffalo / Western NY

Buffalo / Western NY is market 23 of 34: about 1.1 GW across 5 campuses in 3 counties. 0 under construction and 1 moratorium in force. Checked 28 Nov 2026

5Campuses
≈1.1 GWIn the pipeline
0Under construction
1Moratoria in force

The shape of the market

By stage

  • Announced2
  • Zoning3

Stated and estimated

  • Stated on record300 MW
  • Our estimate≈829 MW

Who is building

  • Stream500 MW1
  • Blockfusion300 MW1
  • Riverview Innovation Technology Campus300 MW1
  • Summit Outlet FourNot on record1
  • UP North HostingNot on record1

By county

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for Buffalo / Western NYOpen the app, freeStart Pro · $299/mo

Track Buffalo / Western NY in the app, free

Check your email to finish

Questions

How many data centers are in Buffalo / Western NY?

5 tracked pipeline campuses (1.1 GW estimated total, 300 MW reported) across 3 counties in New York. Key signals: 3 sites showing earthwork in satellite imagery, 2 active/extended moratoria, 1 pipeline site in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (300 MW) with estimates from floor area, acreage, investment or backup generation. 75.0% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

1 moratorium is in force in Buffalo / Western NY, covering 1 campus. 3 moratoria and 0 petitions are on record across the market. 1 of 5 campuses sit in high water stress.

How is this market drawn?

Buffalo / Western NY is the 3 counties around its campuses in New York, in NYISO. It ranks 23 of 34 markets by estimated pipeline.

How large is the Buffalo / Western NY data center pipeline?

Wattlas tracks 5 upcoming pipeline campuses in Buffalo / Western NY (1 verified, 0 under construction, 0 permitted), representing 300 MW in reported capacity and 1,129 MW total estimated pipeline. Projects with the largest reported figures include Stream Data Centers STAMP Campus (500–999 MW), Riverview Innovation & Technology Campus (50–499 MW), Blockfusion Niagara Falls (50–499 MW).

What are industrial power rates and serving utilities in Buffalo / Western NY?

Buffalo / Western NY sits in NYISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Buffalo / Western NY data centers?

Across tracked campuses in Buffalo / Western NY, Wattlas links 2 active or extended moratoria (3 total) and 0 public petitions. On physical site risk, 1 of 5 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Buffalo / Western NY data center sites show active satellite land clearing?

Of 4 pinpointed pipeline sites monitored with satellite imagery in Buffalo / Western NY, 3 (75.0%) show active earthwork or pad expansion, including 3 sites clearing ahead of a reported construction stage.