Northern NJ / NY Metro

Northern NJ / NY Metro is market 28 of 34: about 532 MW across 11 campuses in 17 counties. 1 under construction and 1 moratorium in force. Checked 28 Nov 2026

11Campuses
≈532 MWIn the pipeline
1Under construction
1Moratoria in force

The shape of the market

By stage

  • Announced3
  • Site permit7
  • Construction1

Stated and estimated

  • Stated on recordNot on record
  • Our estimate≈532 MW

Who is building

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for Northern NJ / NY MetroOpen the app, freeStart Pro · $299/mo

Track Northern NJ / NY Metro in the app, free

Check your email to finish

Questions

How many data centers are in Northern NJ / NY Metro?

14 tracked pipeline campuses (532 MW estimated total, 0 MW reported) across 17 counties in New Jersey & New York. Key signals: 2 sites showing earthwork in satellite imagery, 1 active/extended moratorium, 7 pipeline sites in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 15.4% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

1 moratorium is in force in Northern NJ / NY Metro, covering 1 campus. 2 moratoria and 26 petitions are on record across the market. 7 of 14 campuses sit in high water stress.

How is this market drawn?

Northern NJ / NY Metro is the 17 counties around its campuses in New Jersey & New York, in PJM. It ranks 28 of 34 markets by estimated pipeline.

How large is the Northern NJ / NY Metro data center pipeline?

Wattlas tracks 14 upcoming pipeline campuses in Northern NJ / NY Metro (8 verified, 1 under construction, 10 permitted), representing 0 MW in reported capacity and 532 MW total estimated pipeline. Projects with the largest reported figures include CoreWeave Kenilworth Campus (50–499 MW), PNJ-01 / -02 (50–499 MW), Quality Technology Services Piscataway (50–499 MW).

What are industrial power rates and serving utilities in Northern NJ / NY Metro?

Northern NJ / NY Metro sits in PJM. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Northern NJ / NY Metro data centers?

Across tracked campuses in Northern NJ / NY Metro, Wattlas links 1 active or extended moratorium (2 total) and 26 public petitions. On physical site risk, 7 of 14 pipeline campuses sit in High or Extremely High baseline water stress (2 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Northern NJ / NY Metro data center sites show active satellite land clearing?

Of 13 pinpointed pipeline sites monitored with satellite imagery in Northern NJ / NY Metro, 2 (15.4%) show active earthwork or pad expansion, including 2 sites clearing ahead of a reported construction stage.