Denver / Front Range
Denver / Front Range is market 22 of 34: about 1.4 GW across 15 campuses in 9 counties. 1 under construction and 1 moratorium in force. Checked 28 Nov 2026
Largest campuses
All 15 campuses
The shape of the market
By stage
- Zoning1
- Site permit13
- Construction1
Stated and estimated
- Stated on recordNot on record
- Our estimate≈1.4 GW
Who is building
Flexential68 MW4
Novva30 MW1- Intermountain Rural Electric Association23 MW1
AmazonNot on record1- Colorado Springs UtilitiesNot on record1
What could slow it
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Denver / Front Range in the app, free
Questions
How many data centers are in Denver / Front Range?
21 tracked pipeline campuses (1.4 GW estimated total, 0 MW reported) across 9 counties in Colorado. Key signals: 9 sites showing earthwork in satellite imagery, 4 active/extended moratoria, 21 pipeline sites in high/extremely high water stress.
Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 45.0% of monitored sites show clearing.
Who is building the most?
Which counties have paused new data centers?
1 moratorium is in force in Denver / Front Range, covering 1 campus. 4 moratoria and 25 petitions are on record across the market. 21 of 21 campuses sit in high water stress.
How is this market drawn?
How large is the Denver / Front Range data center pipeline?
Wattlas tracks 21 upcoming pipeline campuses in Denver / Front Range (8 verified, 1 under construction, 19 permitted), representing 0 MW in reported capacity and 1,385 MW total estimated pipeline. Projects with the largest reported figures include Global AI Data Center (1,000+ MW), Novva Colorado - Data Center CO Springs (Under 50 MW), Flexential Parker (Under 50 MW).
What are industrial power rates and serving utilities in Denver / Front Range?
Denver / Front Range sits in Non-ISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Denver / Front Range data centers?
Across tracked campuses in Denver / Front Range, Wattlas links 4 active or extended moratoria (4 total) and 25 public petitions. On physical site risk, 21 of 21 pipeline campuses sit in High or Extremely High baseline water stress (21 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Denver / Front Range data center sites show active satellite land clearing?
Of 20 pinpointed pipeline sites monitored with satellite imagery in Denver / Front Range, 9 (45.0%) show active earthwork or pad expansion, including 8 sites clearing ahead of a reported construction stage.