Atlanta
Atlanta is market 5 of 34: about 20.9 GW across 56 campuses in 20 counties. 3 under construction and 5 moratoria in force. Checked 28 Nov 2026
Largest campuses
All 56 campuses
The shape of the market
By stage
- Announced11
- Zoning22
- Site permit19
- Building permit1
- Construction3
Stated and estimated
- Stated on record5.3 GW
- Our estimate≈15.6 GW
Who is building
What could slow it
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Atlanta in the app, free
Questions
How many data centers are in Atlanta?
61 tracked pipeline campuses (20.9 GW estimated total, 5,320 MW reported) across 20 counties in Georgia. Key signals: 14 sites showing earthwork in satellite imagery, 9 active/extended moratoria, 7 pipeline sites in high/extremely high water stress.
Estimated pipeline MW combines reported capacity (5,320 MW) with estimates from floor area, acreage, investment or backup generation. 35.9% of monitored sites show clearing.
Who is building the most?
Which counties have paused new data centers?
5 moratoria are in force in Atlanta, covering 8 campuses. 17 moratoria and 19 petitions are on record across the market. 7 of 61 campuses sit in high water stress.
How is this market drawn?
How large is the Atlanta data center pipeline?
Wattlas tracks 61 upcoming pipeline campuses in Atlanta (25 verified, 3 under construction, 22 permitted), representing 5,320 MW in reported capacity and 20,925 MW total estimated pipeline. Projects with the largest reported figures include Bridgeport (Revised) (1,000+ MW), Hampton Technology Park (1,000+ MW), Digital Realty Stilesboro campus (1,000+ MW).
What are industrial power rates and serving utilities in Atlanta?
Atlanta sits in Non-ISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Atlanta data centers?
Across tracked campuses in Atlanta, Wattlas links 9 active or extended moratoria (17 total) and 19 public petitions. On physical site risk, 7 of 61 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Atlanta data center sites show active satellite land clearing?
Of 39 pinpointed pipeline sites monitored with satellite imagery in Atlanta, 14 (35.9%) show active earthwork or pad expansion, including 12 sites clearing ahead of a reported construction stage.