Reno / Tahoe-Reno
Reno / Tahoe-Reno is market 9 of 34: about 8.5 GW across 16 campuses in 6 counties. 3 under construction and 1 moratorium in force. Checked 28 Nov 2026
Largest campuses
All 16 campuses
The shape of the market
By stage
- Announced10
- Zoning1
- Site permit1
- Building permit1
- Construction3
Stated and estimated
- Stated on record3.4 GW
- Our estimate≈5.1 GW
Who is building
Tract4,010 MW3
AppleNot on record2
SwitchNot on record2EdgeCore216 MW1
- MECP1 Reno 1216 MW1
What could slow it
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Reno / Tahoe-Reno in the app, free
Questions
How many data centers are in Reno / Tahoe-Reno?
16 tracked pipeline campuses (8.5 GW estimated total, 3,416 MW reported) across 6 counties in Nevada. Key signals: 1 active/extended moratorium, 16 pipeline sites in high/extremely high water stress.
Estimated pipeline MW combines reported capacity (3,416 MW) with estimates from floor area, acreage, investment or backup generation. 0.0% of monitored sites show clearing.
Who is building the most?
Which counties have paused new data centers?
1 moratorium is in force in Reno / Tahoe-Reno, covering 2 campuses. 1 moratorium and 6 petitions are on record across the market. 16 of 16 campuses sit in high water stress.
How is this market drawn?
How large is the Reno / Tahoe-Reno data center pipeline?
Wattlas tracks 16 upcoming pipeline campuses in Reno / Tahoe-Reno (6 verified, 3 under construction, 2 permitted), representing 3,416 MW in reported capacity and 8,544 MW total estimated pipeline. Projects with the largest reported figures include Tract Virginia Highlands (1,000+ MW), Tract Peru Shelf (500–999 MW), Tract Sapphire (500–999 MW).
What are industrial power rates and serving utilities in Reno / Tahoe-Reno?
Reno / Tahoe-Reno sits in Non-ISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Reno / Tahoe-Reno data centers?
Across tracked campuses in Reno / Tahoe-Reno, Wattlas links 1 active or extended moratorium (1 total) and 6 public petitions. On physical site risk, 16 of 16 pipeline campuses sit in High or Extremely High baseline water stress (2 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Reno / Tahoe-Reno data center sites show active satellite land clearing?
Of 6 pinpointed pipeline sites monitored with satellite imagery in Reno / Tahoe-Reno, 0 (0.0%) show active earthwork or pad expansion, including 0 sites clearing ahead of a reported construction stage.