Portland / Hillsboro & Columbia Gorge

Portland / Hillsboro & Columbia Gorge is market 27 of 34: about 563 MW across 10 campuses in 9 counties. 2 under construction and 0 moratoria in force. Checked 28 Nov 2026

10Campuses
≈563 MWIn the pipeline
2Under construction
0Moratoria in force

The shape of the market

By stage

  • Announced1
  • Site permit7
  • Construction2

Stated and estimated

  • Stated on recordNot on record
  • Our estimate≈563 MW

Who is building

By county

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for Portland / Hillsboro & Columbia GorgeOpen the app, freeStart Pro · $299/mo

Track Portland / Hillsboro & Columbia Gorge in the app, free

Check your email to finish

Questions

How many data centers are in Portland / Hillsboro & Columbia Gorge?

10 tracked pipeline campuses (563 MW estimated total, 0 MW reported) across 9 counties in Oregon. Key signals: 2 sites showing earthwork in satellite imagery, 8 local petitions, 1 pipeline site in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 22.2% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

No moratorium is in force in Portland / Hillsboro & Columbia Gorge today. 1 moratorium and 8 petitions are on record across the market. 1 of 10 campuses sit in high water stress.

How is this market drawn?

Portland / Hillsboro & Columbia Gorge is the 9 counties around its campuses in Oregon, in Non-ISO. It ranks 27 of 34 markets by estimated pipeline.

How large is the Portland / Hillsboro & Columbia Gorge data center pipeline?

Wattlas tracks 10 upcoming pipeline campuses in Portland / Hillsboro & Columbia Gorge (2 verified, 2 under construction, 7 permitted), representing 0 MW in reported capacity and 563 MW total estimated pipeline. Projects with the largest reported figures include Percheron Data Center (50–499 MW), Sabey Umatilla Data Center (50–499 MW), NTT Hillsboro HI2 (50–499 MW).

What are industrial power rates and serving utilities in Portland / Hillsboro & Columbia Gorge?

Portland / Hillsboro & Columbia Gorge sits in Non-ISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Portland / Hillsboro & Columbia Gorge data centers?

Across tracked campuses in Portland / Hillsboro & Columbia Gorge, Wattlas links 0 active or extended moratoria (1 total) and 8 public petitions. On physical site risk, 1 of 10 pipeline campuses sit in High or Extremely High baseline water stress (1 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Portland / Hillsboro & Columbia Gorge data center sites show active satellite land clearing?

Of 9 pinpointed pipeline sites monitored with satellite imagery in Portland / Hillsboro & Columbia Gorge, 2 (22.2%) show active earthwork or pad expansion, including 0 sites clearing ahead of a reported construction stage.