Las Vegas
Las Vegas is market 30 of 34: about 361 MW across 6 campuses in 1 county. 0 under construction and 0 moratoria in force. Checked 28 Nov 2026
Largest campuses
All 6 campuses
The shape of the market
By stage
- Announced4
- Zoning1
- Site permit1
Stated and estimated
- Stated on recordNot on record
- Our estimate≈361 MW
Who is building
- Townsite Solar 2167 MW1
Novva100 MW1- Via West10 MW1
- DesignNot on record1
GoogleNot on record1
By county
What could slow it
- Utilities serving these campuses
- Grid requests on file
- Substations, water stress and flood
- Download this market as CSV
Track Las Vegas in the app, free
Questions
How many data centers are in Las Vegas?
6 tracked pipeline campuses (361 MW estimated total, 0 MW reported) across 1 county in Nevada. Key signals: 13 local petitions, 2 pipeline sites in high/extremely high water stress.
Estimated pipeline MW combines reported capacity (0 MW) with estimates from floor area, acreage, investment or backup generation. 0.0% of monitored sites show clearing.
Which counties have paused new data centers?
No moratorium is in force in Las Vegas today. 0 moratoria and 13 petitions are on record across the market. 2 of 6 campuses sit in high water stress.
How is this market drawn?
Las Vegas is the 1 county around its campuses in Nevada, in Non-ISO. It ranks 30 of 34 markets by estimated pipeline.
How large is the Las Vegas data center pipeline?
Wattlas tracks 6 upcoming pipeline campuses in Las Vegas (2 verified, 0 under construction, 1 permitted), representing 0 MW in reported capacity and 361 MW total estimated pipeline. Projects with the largest reported figures include Townsite Solar 2 Boulder City Data Center (50–499 MW), Novva Holdings, LLC data center tax abatement (50–499 MW), Jet.AI Moapa Data Center (50–499 MW).
What are industrial power rates and serving utilities in Las Vegas?
Las Vegas sits in Non-ISO. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.
What local opposition, moratoria, or water risks affect Las Vegas data centers?
Across tracked campuses in Las Vegas, Wattlas links 0 active or extended moratoria (0 total) and 13 public petitions. On physical site risk, 2 of 6 pipeline campuses sit in High or Extremely High baseline water stress (2 Extremely High). Floodplain and ozone screening are included in Wattlas access.
How many Las Vegas data center sites show active satellite land clearing?
Of 3 pinpointed pipeline sites monitored with satellite imagery in Las Vegas, 0 (0.0%) show active earthwork or pad expansion, including 0 sites clearing ahead of a reported construction stage.