Richmond / Central & Southern VA

Richmond / Central & Southern VA is market 7 of 34: about 14.7 GW across 31 campuses in 18 counties. 4 under construction and 0 moratoria in force. Checked 28 Nov 2026

31Campuses
≈14.7 GWIn the pipeline
4Under construction
0Moratoria in force
All 31 campuses
Carmel Church Data Center300 MWSite permit·Adp Carmel Church Data HubData center project300 MWSite permit·ChesterfieldOld Bermuda Data Center300 MWZoning·Washington Single Family FundTecfusions Clarksville LLC300 MWSite permit·TecfusionsWatkins Centre≈280–1,300 MWZoning·Woodville PartnershipDigital Drive Data Center-Trailer City200 MWSite permit·CoreWeaveIron Mountain White Oak Technology Park (RCH1-RCH2-RCH3)200 MWConstruction·Iron MountainIron Mountain Information Management LLC≈120–260 MWSite permit·Iron MountainMicrosoft Corp - AVC17 Datacenter≈120–260 MWSite permit·MicrosoftGoogle Project Loch≈110–520 MWAnnounced·Watkins LandQTS Project Interchange - Red Route≈110–230 MWSite permit·Team FishelThornberry Data Center Campus≈27–130 MWZoning·ThornberryData center project≈17–77 MWSite permit·Global Securitization ServicesCapital One Services Incorporated≈3–6 MWSite permit·Capital One ServicesOppidan Data Center, Ashland≈3–6 MWSite permit·Clop Ashland VAAmazon AWS - Lake Anna Tech CampusNot on recordConstruction·AmazonBalico data center campus and gas plantNot on recordZoning·BalicoData center projectNot on recordSite permit·PowerHouseEdgeCore Shannon Hill CampusNot on recordZoning·EdgeCoreGoogle Chesterfield County data center campusesNot on recordConstruction·GoogleIronhorse East AshlandNot on recordZoning·Harris and Douglass PropertiesMicrosoft AVC19 Data Center Auxiliary SiteNot on recordSite permit·MicrosoftMicrosoft Hillcrest CampusNot on recordSite permit·MicrosoftMicrosoft LVL-16 Datacenter CampusNot on recordAnnounced·MicrosoftNorth Creek Tech CampusNot on recordConstruction·AmazonPeak 10 IncorporatedNot on recordSite permit·Peak 10

The shape of the market

By stage

  • Announced3
  • Zoning8
  • Site permit15
  • Building permit1
  • Construction4

Stated and estimated

  • Stated on record1.0 GW
  • Our estimate≈13.7 GW

Who is building

By county

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for Richmond / Central & Southern VAOpen the app, freeStart Pro · $299/mo

Track Richmond / Central & Southern VA in the app, free

Check your email to finish

Questions

How many data centers are in Richmond / Central & Southern VA?

37 tracked pipeline campuses (14.7 GW estimated total, 1,000 MW reported) across 18 counties in Virginia. Key signals: 13 sites showing earthwork in satellite imagery, 11 local petitions, 12 pipeline sites in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (1,000 MW) with estimates from floor area, acreage, investment or backup generation. 40.6% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

No moratorium is in force in Richmond / Central & Southern VA today. 0 moratoria and 11 petitions are on record across the market. 12 of 37 campuses sit in high water stress.

How is this market drawn?

Richmond / Central & Southern VA is the 18 counties around its campuses in Virginia, in PJM. It ranks 7 of 34 markets by estimated pipeline.

How large is the Richmond / Central & Southern VA data center pipeline?

Wattlas tracks 37 upcoming pipeline campuses in Richmond / Central & Southern VA (24 verified, 4 under construction, 22 permitted), representing 1,000 MW in reported capacity and 14,673 MW total estimated pipeline. Projects with the largest reported figures include North Creek Tech Campus (1,000+ MW), Tract Hanover Technology Park (1,000+ MW), EdgeCore Shannon Hill Campus (1,000+ MW).

What are industrial power rates and serving utilities in Richmond / Central & Southern VA?

Richmond / Central & Southern VA sits in PJM. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Richmond / Central & Southern VA data centers?

Across tracked campuses in Richmond / Central & Southern VA, Wattlas links 0 active or extended moratoria (0 total) and 11 public petitions. On physical site risk, 12 of 37 pipeline campuses sit in High or Extremely High baseline water stress (0 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Richmond / Central & Southern VA data center sites show active satellite land clearing?

Of 32 pinpointed pipeline sites monitored with satellite imagery in Richmond / Central & Southern VA, 13 (40.6%) show active earthwork or pad expansion, including 12 sites clearing ahead of a reported construction stage.