Dallas-Fort Worth

Dallas-Fort Worth is market 8 of 34: about 10.0 GW across 44 campuses in 16 counties. 3 under construction and 0 moratoria in force. Checked 28 Nov 2026

44Campuses
≈10.0 GWIn the pipeline
3Under construction
0Moratoria in force
All 44 campuses
Lancaster Data Center300 MWSite permit·Lancaster Data Center CampusMARA Granbury Facility300 MWAnnounced·MaraPowerCampus Dallas300 MWConstruction·Bandera VenturesCore Scientific Hunt County / Quinlan Campus (GVT-1 / Telios)285 MWSite permit·Core ScientificSharka Data Center - Building 4≈270–1,300 MWSite permit·GoogleCore Scientific Denton Data Center Campus260 MWSite permit·Core ScientificCore Scientific Denton Data Center Campus260 MWSite permit·Core ScientificFTW Data Center≈230–1,000 MWSite permit·Health Care ServiceCyrusOne DFW10190 MWConstruction·CyrusOneEdgeCore Datacenter - Fujitsu Campus Addition165 MWSite permit·Vilhauer EnterprisesIrving165 MWSite permit·QTSData center project160 MWAnnounced·Ddi GarlandACS Fort Worth140 MWSite permit·Acs DC Hicks Field RoadData Center Park≈100–460 MWSite permit·Collins Technology Park PartnersCyrusOne Allen - Datat Center Phase 1 Building 177 MWSite permit·Structure Tone SouthwestEquinix DA1267 MWBuilding permit·EquinixSDC DFW-VII Data Center Phase 243 MWSite permit·SDC DFW VIINTT TX-4 Data Center36 MWSite permit·Structure Tone SouthwestFTW1 DC1 Expansion≈35–160 MWBuilding permit·QTSData center project≈31–140 MWAnnounced·WinnerAdc Plano≈24–110 MWSite permit·AlignedRoyse City Data Center≈24–110 MWSite permit·BT Gateway Data CenterBank of America - RTX Modular Data Center≈22–100 MWSite permit·Gcth IDallas-Fort Worth16 MWSite permit·Ragingwire Data CentersData center project≈16–76 MWAnnounced·MicrosoftAligned Dallas DFW03Not on recordSite permit·AlignedCity of Allen Compass Datacenters Reinvestment Zone #33Not on recordAnnounced·Compass Datacenters DFWCyrusOne DFW7Not on recordConstruction·Bosworth Steel ErectorsData center projectNot on recordAnnounced·Wells Fargo BankData center projectNot on recordAnnounced·DallasEquinix DA13-1 Data CenterNot on recordBuilding permit·EquinixEzell Drive CampuNot on recordZoning·AmazonGigaPop Red OakNot on recordZoning·Lincoln PropertyNTT Dallas TX4Not on recordAnnounced·NTTPrime Data Centers: DFW04-03.01Not on recordAnnounced·PrimeQTS Fort Worth 1 DC1Not on recordSite permit·QTSQTS Irving DFW2-DC3Not on recordAnnounced·QTSSkybox PowerCampus DallasNot on recordBuilding permit·Lancaster Data Center CampusStack Infrastructure DFW02Not on recordSite permit·Stack

The shape of the market

By stage

  • Announced10
  • Zoning2
  • Site permit25
  • Building permit4
  • Construction3

Stated and estimated

  • Stated on record460 MW
  • Our estimate≈9.6 GW

Who is building

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for Dallas-Fort WorthOpen the app, freeStart Pro · $299/mo

Track Dallas-Fort Worth in the app, free

Check your email to finish

Questions

How many data centers are in Dallas-Fort Worth?

50 tracked pipeline campuses (10.0 GW estimated total, 460 MW reported) across 16 counties in Texas. Key signals: 18 sites showing earthwork in satellite imagery, 7 local petitions, 32 pipeline sites in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (460 MW) with estimates from floor area, acreage, investment or backup generation. 46.2% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

No moratorium is in force in Dallas-Fort Worth today. 3 moratoria and 7 petitions are on record across the market. 32 of 50 campuses sit in high water stress.

How is this market drawn?

Dallas-Fort Worth is the 16 counties around its campuses in Texas, in ERCOT. It ranks 8 of 34 markets by estimated pipeline.

How large is the Dallas-Fort Worth data center pipeline?

Wattlas tracks 50 upcoming pipeline campuses in Dallas-Fort Worth (17 verified, 3 under construction, 33 permitted), representing 460 MW in reported capacity and 10,013 MW total estimated pipeline. Projects with the largest reported figures include RCM Hill: Hill County, TX (1,000+ MW), Riot Platforms Corsicana (1,000+ MW), Nexus Data Center - Apex Project (500–999 MW).

What are industrial power rates and serving utilities in Dallas-Fort Worth?

Dallas-Fort Worth sits in ERCOT. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Dallas-Fort Worth data centers?

Across tracked campuses in Dallas-Fort Worth, Wattlas links 0 active or extended moratoria (3 total) and 7 public petitions. On physical site risk, 32 of 50 pipeline campuses sit in High or Extremely High baseline water stress (10 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Dallas-Fort Worth data center sites show active satellite land clearing?

Of 39 pinpointed pipeline sites monitored with satellite imagery in Dallas-Fort Worth, 18 (46.2%) show active earthwork or pad expansion, including 17 sites clearing ahead of a reported construction stage.