Chicago

Chicago is market 15 of 34: about 5.3 GW across 55 campuses in 9 counties. 6 under construction and 2 moratoria in force. Checked 28 Nov 2026

55Campuses
≈5.3 GWIn the pipeline
6Under construction
2Moratoria in force
All 55 campuses
NTT Chicago Campus200 MWSite permit·NTTData Center Campus100 MWSite permit·EdgedC1 Chicago Aurora III LLC (Aurora)≈83–380 MWAnnounced·C1 Chicago Aurora IIIMicrosoft Northlake60 MWSite permit·MicrosoftORD-01 Chicago48 MWSite permit·AlignedData center project≈45–210 MWAnnounced·CentersquareMicrosoft Hoffman Estates - Building 3≈42–190 MWAnnounced·MicrosoftCHI01 Chicago Data Center40 MWAnnounced·StackStream Data Centers Ordc Campus40 MWConstruction·StreamQuality Technology Services Chicago38 MWAnnounced·QTSCHI-1 - Chicago Data Center36 MWAnnounced·Iron MountainT5 Data Centers - T5@Chicago lll36 MWConstruction·T5T5 Data Centers - T5@Chicago V36 MWSite permit·T5Aligned Data Centers ORD03≈32–150 MWBuilding permit·AlignedServerfarm Chicago31 MWAnnounced·ServerfarmChicago CH3 Data Center30 MWBuilding permit·Digital RealtyT5@CHICAGO II LP30 MWSite permit·T5Data center project26 MWAnnounced·CentersquareEnsono Data Center≈25–110 MWSite permit·EnsonoData center project20 MWBuilding permit·HydravaultEdgeConneX Chicago - EDCCHI0120 MWBuilding permit·EdgeConneXHydraVault LLC (Chicago)20 MWAnnounced·HydravaultMEDP Mission Critical Facility, LLC dba Metro Edge (Chicago)20 MWAnnounced·Medp Mission Critical Facility LLC Dba Metro EdgeC1 Chicago 1 LLC - C1 Chicago 2 LLC (Wood Dale)18 MWAnnounced·C1 Chicago 1 LLC C1 Chicago 2Colovore LLC16 MWConstruction·ColovoreChirisa Volo Technology Park YLO-0114 MWAnnounced·ChirisaTierPoint Illinois LLC≈13–61 MWSite permit·TierPointData center project≈11–52 MWSite permit·Digital RealtyChicago Enterprise LLC7 MWSite permit·Chicago EnterpriseClop Carol Stream IL LLC≈7–33 MWSite permit·Clop Carol Stream ILProposed Data center ORD-1≈4–19 MWSite permit·US Signal Prop AuroraProposed Data Center ORD-2≈4–19 MWSite permit·SLS ConsultantsAligned ORD-04Not on recordBuilding permit·AlignedCHI-22 Franklin ParkNot on recordBuilding permit·Digital RealtyComEd Kehoe Data Center Duct Package ProjectNot on recordSite permit·DupageComEd TSS184 Elk Grove East Building & Stream Data Center TUG LinesNot on recordSite permit·CookCyrusOne ChicagoNot on recordConstruction·CyrusOneData center projectNot on recordBuilding permit·Netrality Data CentersData center projectNot on recordSite permit·DupageData CentersNot on recordZoning·DekalbEdgeConneXNot on recordSite permit·EdgeConneXElk Grove Village Property LLC (Phase 1) (Elk Grove Village)Not on recordAnnounced·Elk Grove Village PropertyEquinix LLCNot on recordSite permit·EquinixGI Partners Chicago Data CenterNot on recordBuilding permit·GI PartnersGoldframe LLC (DeKalb)Not on recordAnnounced·GoldframeKaris Critical DeKalb CampusNot on recordZoning·Karis CriticalMicrosoft Hoffman Estates (CHI05) Data CenterNot on recordSite permit·MicrosoftOracle America, Inc. (Elk Grove Village)Not on recordAnnounced·OracleProject Steel Data Center CampusNot on recordZoning·PrologisTract Morris Data CenterNot on recordZoning·Tract

The shape of the market

By stage

  • Announced15
  • Zoning5
  • Site permit21
  • Building permit8
  • Construction6

Stated and estimated

  • Stated on record40 MW
  • Our estimate≈5.3 GW

By county

Power in this market
  • Utilities serving these campuses
  • Grid requests on file
  • Substations, water stress and flood
  • Download this market as CSV
Power, water and flood for ChicagoOpen the app, freeStart Pro · $299/mo

Track Chicago in the app, free

Check your email to finish

Questions

How many data centers are in Chicago?

55 tracked pipeline campuses (5.3 GW estimated total, 40 MW reported) across 9 counties in Illinois. Key signals: 9 sites showing earthwork in satellite imagery, 3 active/extended moratoria, 55 pipeline sites in high/extremely high water stress.

Estimated pipeline MW combines reported capacity (40 MW) with estimates from floor area, acreage, investment or backup generation. 20.5% of monitored sites show clearing.

Who is building the most?
Which counties have paused new data centers?

2 moratoria are in force in Chicago, covering 4 campuses. 5 moratoria and 66 petitions are on record across the market. 55 of 55 campuses sit in high water stress.

How is this market drawn?

Chicago is the 9 counties around its campuses in Illinois, in PJM. It ranks 15 of 34 markets by estimated pipeline.

How large is the Chicago data center pipeline?

Wattlas tracks 55 upcoming pipeline campuses in Chicago (30 verified, 6 under construction, 29 permitted), representing 40 MW in reported capacity and 5,330 MW total estimated pipeline. Projects with the largest reported figures include Tract Morris Data Center (1,000+ MW), Data center project (1,000+ MW), Equinix LLC (500–999 MW).

What are industrial power rates and serving utilities in Chicago?

Chicago sits in PJM. Industrial power rates, serving utilities, substation and transmission distance, large-load tariffs and interconnection queue depth for every tracked site are included in Wattlas access.

What local opposition, moratoria, or water risks affect Chicago data centers?

Across tracked campuses in Chicago, Wattlas links 3 active or extended moratoria (5 total) and 66 public petitions. On physical site risk, 55 of 55 pipeline campuses sit in High or Extremely High baseline water stress (10 Extremely High). Floodplain and ozone screening are included in Wattlas access.

How many Chicago data center sites show active satellite land clearing?

Of 44 pinpointed pipeline sites monitored with satellite imagery in Chicago, 9 (20.5%) show active earthwork or pad expansion, including 5 sites clearing ahead of a reported construction stage.