Data center projects
1,082 campuses are planned or being built in the US, with 155.7 GW disclosed so far. 619 have a site permit or later. Checked 27 Nov 2026
Where the US stands
Track the US pipeline in the app, free
What the stages mean
- AnnouncedNamed by the owner or an official
- ZoningRezoning filed or approved
- Site permitSite plan or land use approved
- Building permitPermit to build issued
- ConstructionWork on site has started
- OperatingRunning and taking load
Questions
About this data
As of 2026-11-27, Wattlas tracks 1,082 planned and under-construction US data center campuses confirmed by public filings across 46 states. Every pipeline project is confirmed by at least one official filing (air permits, zoning dockets, site plans, building permits, utility cases or tax incentive records) with a verified developer or owner and jurisdiction. The Operating group lists 5,114 running campuses and the Reported group 1,258 plans named by industry trackers but not yet confirmed by a public filing.
Projects by state
Related
Every pipeline campus
Alabama
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Which US states have the most planned data center projects?
By confirmed public pipeline projects with an identified developer and jurisdiction, the largest states are Virginia (298), Texas (143), Georgia (87), Pennsylvania (65), Minnesota (60). Across all 46 covered states, Wattlas tracks 1,082 public pipeline campuses, with 155,652 MW reported across 346 of them.
What qualifies a data center campus for the Wattlas public project index?
Every project here is planned or under construction in the United States, confirmed by at least one official public filing (zoning docket, air or site permit, building permit, utility filing, or tax incentive record), and has a verified developer or owner and city or county location. Operating sites and tracker-reported plans not yet confirmed by a filing are listed under their own groups.
How are megawatt (MW) figures reported on project pages?
The public pipeline has reported MW for 346 projects, drawing on public filings, company announcements and third-party reporting. Another 390 have estimated ranges based on available floor area, acreage, investment or backup generation data. Wattlas Pro includes available MW evidence and source links.